Laserfiche WebLink
' Bank of Stockton - Cutter Lumber Site Page 8 <br /> Quarterly Groundwater Monitoring Report <br /> I <br /> Project No 102 2 <br /> le May 5, 2004 <br />' 5.0 SIGNATURES AND CERTIFICATION <br /> This project was performed by Geo-Phase Environmental Inc in accordance with <br />' accepted professional standards for environmental consulting work, accepted <br /> and in effect at the time of this investigation except as may be otherwise set <br /> tforth above <br /> This report was prepared by <br /> Geo-Phase Environmental Inc <br />' D GEO( <br /> � <br /> STEFIVEN <br /> iKfOtlI3 <br />' h n M Lankfor s �0 4� -' <br /> Step e <br /> Registered Geologist# 4283 <br />' Registered Environmental Assessor:# 4459 <br /> 1 <br /> 1 <br /> 2937 Veneman Ave ,#8240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0293 <br />