Laserfiche WebLink
' Bank of Stockton - Cutter Lumber Site Page 2 <br /> Quarterly Groundwater Monitoring Report <br />' Project No 102 2 <br /> • May 5, 2004 <br />' In June of 2003, a pilot test of soil vapor extraction and air sparging was <br /> completed as documented in the August 1, 2003 report entitled Report, Remedial <br /> Action Pilot Test and Feasibility Stud Recently, a final corrective action plan <br />' (CAP) was approved by the San Joaquin County Department of Environmental <br /> Health, and construction of the system is underway <br />' 1.2 Scope of Work <br />' The following work was completed during this round of groundwater monitoring <br /> 1 The depth to groundwater was measured in all eight wells remaining on the <br />' site <br /> 2 Groundwater monitoring included sample collection from six of the eight <br />' extant wells <br /> 3 Purge water from the prior monitoring event was collected for recycling <br /> 1 <br /> I <br /> 1 <br /> 1 <br />' 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> 1 <br />