Laserfiche WebLink
i <br /> Bank of Stockton - Cutter Lumber Site Page 6 <br /> Quarterly Groundwater Monitoring Report <br /> Project No 102 2 <br /> • May 5, 2004 <br /> 3.0 DISCUSSION <br /> 31 Discussion of Data <br />' Field and analytical data results are summarized in Tables 1 and 2 and <br /> illustrated in Figures 3 through 5 <br />' The contour map of the groundwater surface (Figure 3) suggests that the flow of <br /> groundwater is to the northeast, and appears generally consistent with <br /> historical norms Over the past quarter the groundwater elevation risen about 3 <br />' feet from the prior monitoring event <br /> Over the years, the contaminant concentrations have displayed a gradual <br />' downward trend in all of the wells except MW-813 and MW-9 <br /> 3.2 Future Work Schedule <br />' QuarterlY groundwater monitoring and sampling should continue The San <br /> Joaquin County EHD has approved a Corrective Action Plan (CAP) <br />' Construction of the remedial system is underway with 8 new service wells <br /> having been constructing in the week of April 26 <br /> 1 <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br />