My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009881
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
ARCHIVED REPORTS XR0009881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 1:59:50 PM
Creation date
7/30/2019 1:15:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009881
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Bank of Stockton - Cutter Lumber Site Page 6 <br /> Quarterly Groundwater Monitoring Report <br /> Project No 102 2 <br /> • May 5, 2004 <br /> 3.0 DISCUSSION <br /> 31 Discussion of Data <br />' Field and analytical data results are summarized in Tables 1 and 2 and <br /> illustrated in Figures 3 through 5 <br />' The contour map of the groundwater surface (Figure 3) suggests that the flow of <br /> groundwater is to the northeast, and appears generally consistent with <br /> historical norms Over the past quarter the groundwater elevation risen about 3 <br />' feet from the prior monitoring event <br /> Over the years, the contaminant concentrations have displayed a gradual <br />' downward trend in all of the wells except MW-813 and MW-9 <br /> 3.2 Future Work Schedule <br />' QuarterlY groundwater monitoring and sampling should continue The San <br /> Joaquin County EHD has approved a Corrective Action Plan (CAP) <br />' Construction of the remedial system is underway with 8 new service wells <br /> having been constructing in the week of April 26 <br /> 1 <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br />
The URL can be used to link to this page
Your browser does not support the video tag.