Laserfiche WebLink
I <br /> I <br /> I � <br /> GEO-PHASE <br /> ENVIRONMENTAL <br /> 1 <br /> August 1, 2003 <br /> Mr Pat O'Rourke <br />' Bank of Stockton <br /> 660 N Main Street <br /> Manteca, CA 95336 <br /> RE Report—Remedial Action Pilot Test& Feasibility Study <br /> Cutter Lumber—Western Lift Site,3930 (USTCFP Site Code 1878, WRCB Case Code 70607700412) <br /> Dear Mr O'Rourke <br /> A Remedial Feasibility Testing Work Plan was prepared and submitted on October 30, 2001 that <br /> described the methods and protocols to be used to construct and operate a pilot scale remedial system <br /> The purpose of the Work Plan was to propose methods and protocols to be used to test the feasibility <br /> of certain remedial methods that are being considered to mitigate the gasoline release at the subject <br /> site The Work Plan was approved by the San Joaquin County Environmental Health Department on <br /> September 7, 2001, and much later, on January 6, 2003, the California UST Clean-up fired issued pre- <br /> approval for the costs anticipated in the project <br /> During the week of June 9, 2003, field work for the pilot test began The attached report documents <br /> the construction of the pilot system and its operation and results Based on these results, a feasibility <br /> study was completed to evaluate the relative merits of several remedial alternatives <br />' Thank you for this opportunity to serve your environmental needs <br /> Sincerely, <br /> Geo-Phase Envir ental Inc <br /> Stephen M Lankford, RG, REA <br /> President <br /> cc Harlan Knoll, San Joaquin Co, PHS/EHD <br /> E2937 Veneman Ave ,413240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br />