Laserfiche WebLink
' Bank of Stockton -Cutter Lumber Site Page 3 <br /> Quarterly Groundwater Monitoring Report <br /> Project No 102 2 <br /> January 21,2002 <br />' 2.0 GROUNDWATER MONITORING <br /> The following sections describe the procedures associated with the completion of <br />' groundwater monitoring at the site along with documenting the disposal of the <br /> well purge water associated with groundwater monitors ig activity <br />' 2.1 Groundwater Sample Collection <br />' On December 5, 2001, Del-Tech Geotechnical Services of Oakdale, CA mobilized <br /> to the site to complete groundwater monitoring The groundwater monitoring <br /> procedure was as follows Upon arrival, each well was opened and the water <br />' level allowed to equilibrate As each well was opened and prior to taking the <br /> depth to groundwater measurement, a PID organic vapor meter was used to <br /> screen for VOC's in the head space of the well The dopth to groundwater was <br />' then measured by lowering an electronically actuated air 1 water interface <br /> detector suspended from a polyethylene measuring tape calibrated to the nearest <br /> 0 01 foot (see groundwater monitoring data sheets in Appendix B) A careful <br />' notation made of the depth to groundwater as measured by the device No <br /> measurable free product was observed in the wells <br /> Each well was pumped with a dedicated Wattera pump or by inserting a <br /> submersible pump into the well and lowering it to bottom Well water was <br /> containerized in 55-gallon DOT approved polyethylene drums, properly labeled, <br /> and temporarily stored on-site The rate of well purging was monitored, and <br /> each well was purged of at least three casing volumes Dr until the groundwater <br />' parameters (temperature, conductivity, and pH) had stabilized indicating that <br /> water representative of actual aquifer conditions ,vas entering the well <br /> Groundwater parameter stabilization was characterized by three successive <br /> readings within 10 percent After the wells had been allowed to recharge to at <br /> least 80 percent of their original volume, samples were collected from them <br /> using methods described below <br /> A stainless steel bailer belayed on a clean stainless steel line was used to collect <br /> each sample Bailer cleanliness was verified by collecting a bailer blank <br />' (pouring distilled water through the bailer and collecting it in a VOA vial) prior <br /> to collecting the analytical sample Before and in bei ween uses, all sampling <br /> i equipment was washed using a portable steam cleaner Disposable gloves were <br /> worn by the sampling technician while collecting all s Lmples The gloves were <br /> changed between the collection of each sample to redu(e the potential for cross- <br /> contamination <br /> 2937 Veneman Ave ,#13240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br />