Laserfiche WebLink
' Bank of Stockton- Cutter Lumber Site Page 6 <br /> Quarterly Groundwater Monitoring Report <br /> Project No 102 2 <br /> January 21,2002 <br />' 3.0 DISCUSSION <br />' 3.1 Discussion of Data <br />' Field and analytical data results are summarized n Tables 1 and 2 and <br /> illustrated in Figures 3 through 5 <br /> The map of groundwater gradient (Figure 3) suggests that the flow of <br /> groundwater is to the northeast The water table ha, risen about 1 to 2 feet <br /> since the last monitoring event in September of 2001 The direction and <br />' gradient of flow have remained generally consistent over the entire time the <br /> wells have been monitored, although in this event, the gradient has flattened <br /> substantially since the September event <br />' Ing eneral, the analytic data suggest that contamin tnt levels are gradually <br /> decreasing except in the area of MW-8B and MW-7, near the core of the plume <br />' It appears that the lateral extent of the contaminant plume may also be <br /> gradually decreasing The wells MW-10 and MW-11, at the distal periphery of <br /> the plume have been producing samples with essentially non-detectible levels to <br /> petroleum contaminants <br />' 3.2 Future Work Schedule <br /> Quarterly groundwater monitoring and sampling should continue Recently, <br />' Geo-Phase Environmental submitted a Work Plan that proposed pilot level <br /> remedial work to investigate possible methods to achi3ve an adequate level of <br /> mitigation of this site The Work Plan has been approved by the LOP agency, <br />' and a detailed budget covering the work is being prepared for submission to the <br /> State UST Clean-up Fund for pre-approval of the associ ited costs <br /> 1 <br />' 2937 Veneman Ave,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> 1 <br />