Laserfiche WebLink
I DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br />' MONITORING WELL FIELD LOG 1999 <br />' SAMPLE LOCATION/MW - 8B DATE: 10/5/99 <br />' PROJECT NAME: CUTTER LUMBER ANALYSIS PERFORMED: SEE CHAIN OF CUSTODY <br /> ADDRESS: 3430 S ELDORADO SAMPLE TIME: 1433 <br /> CITY STATE: STOCKTON,CALIF SAMPLE CONTAINERS 2 VOA'S & 1 B B <br />' SITE CONTACT: PRESERVATIVES: HCL <br /> CONSULTANT: GEO-PHASE ENVIRONMENTAL LAB.ANALYSIS BY: SHERWOOD <br /> PROJECT MANAGER STEVE LANKFORD MONUMENT: FLUSH <br />' SAMPLER: I DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED: WELL CASING DIA.; 2" 1 01632 <br /> SAMPLE MEDIA.-IQ GROUNDWATER P.I.D.READING/ODOR: NIA GAS <br />' TOP OF CASING ELEVATION: MSL COLOR: GREY <br /> DEPTH TO WATER: reeL100th's 3020 FEET CALC.PURGE VOL.: 2534496 GAL <br /> DEPTH OF WELL: [eeL100th's 4573 FEET TOTAL VOLUME PURGED: 75 GAL <br />' STANDING WATER COLUMN: 1553 FEET DEPTH OF PUMP: 40 FEET <br /> FIELD PARAMETERS <br />' TIME CASING DRAW SUBMERS pH E.C. TEMP. O.R.P. ISSOLVEE TURBIDITY <br /> VOLUME DOWN RATE OXYGEN COLOR <br />' PER PURGE (D T W.) (GPM/LPK (units) (UsMHOS) (Cew-) (MVQIU) (PPA) (N T U) <br /> 0 NIA 5 GPM 710 1028 201 -74 NIA GREY <br /> 25 p701 1031 202 -86 " <br /> 5 " 675 1030 202 -112 " <br />' 75 709 1030 201 -153 " <br /> PURGE METHOD- PURGER PUMP <br /> SAMPLE METHOD' 1'STAINLESS STEEL BAILER W/STAINLESS STEEL.WIRE LINE <br />' D T W AFTER PURGE' D.T W AT SAMPLE TIME. 33 83' <br /> WELL INTEGRITY CAP&SEAL ARE SE:CURE? AMERICAN LOCK INSTALLED <br /> WELL LOCATION SFE SITE MAP <br />' REMARKS. <br /> WEATHER: CLEAR SKIES WIND NW5 <br /> UALIT'Y CONTROL' ALL PURGING E UIPMENT AND SAMPLING EQUIPMENT WAS CLEWED IN THE <br />' FIELD WIPHA STEAMCLEANER do ALCONOX SOAP NEW NUBILE GLOVES <br /> CONTAINMENT' DOT 17 55 GAL STEEL DR UM OR 60 GAL.POLY DR UM <br /> INSTRUMENTATION Y S I 3560 FLOWCELL Y S I DISSOLVED OXYGEN METER <br />' SOLINIST SLOPE METER THEBMODINE 580B P ID <br /> . KE,CK INTERFACE METER TURBIDITY METER <br /> 1 <br />