Laserfiche WebLink
GEO-PHASE <br /> - - ENVIRONMENTAL <br /> 4� <br /> 1 <br /> tFebruary 9, 2006 <br /> GPE Project Ni 0.:102.2 <br /> Project Name: BofS (Cutter) <br /> Mr. Pat O'Rourke <br /> Bank of Stockton <br /> 660 N. Main Street <br /> Manteca, CA 95336 <br /> LRe: Report: Quarterly Groundwater Monitoring, Fourth Quarter 2005 <br /> Cutter Lumber Site /Western Lift (USTGFP Claim No. 01878) <br /> CWRCB GID Code T0607700498 <br /> I3930 S. El Dorado, Stockton, CA <br /> LDear Mr. O'Rourke: <br /> Geo-Phase Environmental Inc. is pleased to submit this Groundwater Monitoring <br /> -�• Report documenting the groundwater monitoring work completed at the subject site on <br /> LC December 14, 2005. 'Phis includes measuring of depth-to-wager in all eight of the <br /> monitoring wells on the site, and sampling five of the wells. <br /> We appreciate this opportunity to serve your environmental needs. If you have any <br /> questions or comments please do not hesitate to call (209) 569-0293. <br /> Respectfully submitted, <br /> r� <br /> j Geo-Phase Enviro ental Inc. <br /> Stephen M. Lankford, PG, REA <br /> President <br /> ' v Enclosures <br /> cc: Harlin Knoll, San Joaquin Co. EHD <br /> W' <br /> • <br /> ._..� 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone (209) 769-0293 <br /> Modesto, CA 95356 Fax (209) 569-0295 <br />