Laserfiche WebLink
1 Bank of Stockton - Cutter Lumber Site Page 6 <br /> Quarterly Groundwater Monitoring Report <br /> ' Project No. 1422 <br /> . February 9, 2446 <br /> 1 3.0 DISCUSSION <br /> 3.1 Discussion of Data <br /> Field and analytical data results are summarized in Tables 1 and 2 and <br /> ' illustrated in Figures 3 through 5. <br /> The contour map of the groundwater surface (Figure 3) suggests that the flow of <br /> ' groundwater is to the northeast, and appears generally consistent with <br /> historical norms except for the groundwater mound around MW-7. This is a <br /> ' result of the vapor extraction system, which has been applying a vacuum to <br /> MW-7 for the past several months. Excluding the mound, over MW-7, the <br /> groundwater elevation has changed little since the prior monitoring event. <br /> ' 3.2 Future Work Schedule <br /> Quarterly groundwater monitoring will continue. Continuous operation of the <br /> new SVEIAS remedial system will continue. <br /> I � <br /> r <br /> • <br /> 2937 Veneman Ave.,#B290 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0293 <br /> 1 <br />