Laserfiche WebLink
1 <br /> GEOTHASE <br /> 'ENVIRONMENTAL <br /> 1 <br /> 1 October 20, 2005 <br /> I <br /> GPE Project No,:102.2 <br /> 1 Project Name: BofS (Cutter) <br /> Mr. Pat O'Rourke <br /> ' Bank of Stockton <br /> 660 N. Main Street <br /> Manteca, CA 95336 <br /> ' Re: Report: Quarterly Groundwater Monitoring, Third Quarter 2005 <br /> Cutter Lumber Site /Western Lift (USTCFP Claim No. 01878) <br /> ' CWRCB CID Code 70607700498 <br /> 3930 S. El Dorado, Stockton, CA <br /> Dear Mr. O'Rourke: <br /> Geo-Phase Environmental Inc. is pleased to submit this Groundwater Monitoring <br /> Report documenting the groundwater monitoring work completed at the subject site on <br /> ' September .19, 2005. This includes measuring of depth-to-water in all eight of the <br /> monitoring wells on the site, and sampling five of the wells. <br /> 1 We appreciate this opportunity to serve your environmental needs. If you have any <br /> questions or comments please do not hesitate to call (209) 569-0293. <br /> 1 <br /> Respectfully submitted, <br /> Geo-Phase Environme tal Inc. <br /> Stephen M. Lankford, PG, REA <br /> President <br /> 1 Enclosures <br /> 1 cc: Harlin Knoll, San Joaquin Co. EHD <br /> 1 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br />