Laserfiche WebLink
TABLE OF CONTENTS <br /> 1 <br /> 1.0 INTRODUCTION <br /> 1.1 Site History <br /> ' 1.2 Scope of Work <br /> 2.0 WELL CONSTRUCTION <br /> ' 2.1 Permitting <br /> 2.2 Soil Boring Installation <br /> 2.3 Well Construction <br /> ' 2.3.1 Vapor Extraction Well Construction <br /> 2.3.2 Air Sparge Well Construction <br /> 2.4 Well Development <br /> 2.5 Waste Disposal <br /> ' 3.0 SOIL SAMPLING & ANALYSIS <br /> 3.1 Soil Sample Collection <br /> 3.2 Soil Sample Analysis <br /> 3.3 Soil Analytical Results <br /> ' 4.0 SYSTEM INSTALLATION <br /> 4.1 Trenching&Piping <br /> 4.2 Manifolds <br /> ' 4.3 Vapor Extraction System <br /> 4.4 Air SpargeSystem <br /> 4.5 Carbon Filtration System <br /> '. 5.0 SYSTEM MONITORING & MAINTENANCE <br /> 5.1 ProcesslEffluent Air Monitoring <br /> 5.2 Sparge Air Monitoring <br /> 6.0 SYSTEM START-UP <br /> 7.0 SIGNATURES AND CERTIFICATION <br /> Summary Tables <br /> ' Soil Analytic Data 1 <br /> Figures <br /> Vicinity Map I <br /> Site Map Showing Service Well Locations 2 <br /> SVEIAS System Construction Schematic 3 <br /> Appendices <br /> ' Laboratory Data Sheets-Soil A <br /> Soil Boring Logs B <br /> Waste Disposal Documents C <br /> ' 2937 Veneman Ave., #13240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br />