Laserfiche WebLink
i <br />� 1 <br /> 1 <br /> GEOTHASE <br /> i - ENVIRONMENTAL o C T 19 2004 <br /> ' I=NVIRONIME1iT HEALTH <br /> PER�r9ITISERVICES <br /> ' September 14, 2004 <br /> 1 GPE Project No.:102.2 <br /> Project Name: BofS (Cutter) <br /> Mr. Pat O'Rourke <br /> Bank of Stockton <br /> 660 N. Main Street <br /> Manteca, CA 95336 <br /> Re: Report: Quarterly Groundwater Monitoring, Third Quarter 2004 <br /> Cutter Lumber Site /Western Lift (USTCFP Claim No. 01878) <br /> 1 CWRCB GID Code 70607700498 <br /> 3930 S. El Dorado, Stockton, CA <br /> 1 Dear Mr. O'Rourke: <br /> Geo-Phase Environmental Inc. is pleased to submit this Groundwater Monitoring <br /> lie <br /> Report documenting the groundwater monitoring work completed at the subject site on <br /> September 1, 2004. This includes the measuring of depth-to-water on all eight wells on <br /> the site, and sampling six of the wells. <br /> 1 We appreciate this opportunity to serve your environmental needs. If you have any <br /> questions or comments please do not hesitate to call (209) 569-0293. <br /> Respectfully subm' ted, <br /> Geo-Phase Environ tal Inc. <br /> ' Stephen M. Lankford, RG, REA <br /> President <br /> ' Enclosures <br /> cc: Harlin Knoll, San Joaquin Co. EHD <br /> 1 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0295 <br /> 1 <br />