Laserfiche WebLink
1 Bank of Stockton - Cutter Lumber Site Page 5 <br /> Quarterly Groundwater Monitoring Report <br /> 1 Project No. 102.2 <br /> • September 14, 2004 <br /> I <br /> ' 2.4 Waste Disposal <br /> I <br /> Purge water from this monitoring event was temporarily stored in 55-gallon <br /> drums on the site. The waste water will be removed for recycling prior to the <br /> next monitoring event. <br /> i , <br /> I <br /> IIS <br /> I <br /> 1 ' <br /> 1 <br /> • <br /> 1 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone (209) 569-0293 <br /> i <br /> Modesto, CA 95356 Fax(209) 569-0293 <br /> I <br />