Laserfiche WebLink
�a <br /> 1 <br /> GEO-PHASE <br /> ENVIRONMENTAL <br /> ' October 30, 2001 <br /> Mr. Pat O'Rourke, AVP <br /> Bank of Stockton <br /> 660 N. Main Street <br /> Manteca, CA 95336 <br /> ' RE: Work Plan-Remedial Action Feasibility Study <br /> Cutter Lumber Site,3930 S. EI Dorado,Street.Stockton,California(Site Code 1878) <br /> Dear Mr. O'Rourke: <br /> ' On September 7, 2001, the Bank of Stockton was directed by the San Joaquin County Public Health <br /> • Service Environmental Health Division to prepare a Work Pian complete pilot testing of possible <br /> remedial methods that may be used to mitigate the gasoline impacted soil and groundwater at the <br /> subject site. The Work. Plan describes methods and protocols to be used to conduct pilot level <br /> feasibility testing to validate engineering methods and determine which of several engineered remedial <br /> methods will be most likely to succeed in adequately mitigating the hydrocarbon release at this site. <br /> ' The attached Work Plan is submitted in response to the directive. If you have questions about the <br /> P Y <br /> content of the Work Plan or need additional information, please contact me. Thank you for this <br /> ' opportunity to serve your environmental needs. <br /> Sincerely, <br /> ' Geo-Phase Enviro ental Inc. <br /> Stephen M. Lankford, RG, REA <br /> ' President <br /> ' cc: Harlan Knoll, San Joaquin Co., PHSIEHD <br /> I ' 2937 Veneman Ave.,#13240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />