My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009900
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
ARCHIVED REPORTS XR0009900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 1:52:55 PM
Creation date
7/30/2019 1:24:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009900
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�a <br /> 1 <br /> GEO-PHASE <br /> ENVIRONMENTAL <br /> ' October 30, 2001 <br /> Mr. Pat O'Rourke, AVP <br /> Bank of Stockton <br /> 660 N. Main Street <br /> Manteca, CA 95336 <br /> ' RE: Work Plan-Remedial Action Feasibility Study <br /> Cutter Lumber Site,3930 S. EI Dorado,Street.Stockton,California(Site Code 1878) <br /> Dear Mr. O'Rourke: <br /> ' On September 7, 2001, the Bank of Stockton was directed by the San Joaquin County Public Health <br /> • Service Environmental Health Division to prepare a Work Pian complete pilot testing of possible <br /> remedial methods that may be used to mitigate the gasoline impacted soil and groundwater at the <br /> subject site. The Work. Plan describes methods and protocols to be used to conduct pilot level <br /> feasibility testing to validate engineering methods and determine which of several engineered remedial <br /> methods will be most likely to succeed in adequately mitigating the hydrocarbon release at this site. <br /> ' The attached Work Plan is submitted in response to the directive. If you have questions about the <br /> P Y <br /> content of the Work Plan or need additional information, please contact me. Thank you for this <br /> ' opportunity to serve your environmental needs. <br /> Sincerely, <br /> ' Geo-Phase Enviro ental Inc. <br /> Stephen M. Lankford, RG, REA <br /> ' President <br /> ' cc: Harlan Knoll, San Joaquin Co., PHSIEHD <br /> I ' 2937 Veneman Ave.,#13240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.