Laserfiche WebLink
' Work Plan-Pilot Testing Page 4 <br /> Cutter Lumber Site <br /> lieProject No. 102.3 <br /> October 30,2001 <br /> ' • Prepare a report that will document the activities mentioned above and describe the <br /> results and their implications. <br /> • Based on the results and past work performed at the site as well as the adjacent <br /> ' Manna Pro site, a Feasibility Study will be completed as part of the report that will <br /> evaluate the effectiveness of at least 3 possible remedial methods. Among these <br /> ' methods will be the sparge/vapor extraction method, vapor extraction alone, the <br /> groundwater/vapor extraction option, and natural attenuation alone (i.e. no engineered <br /> remedial action). <br /> ' • One year of quarterly groundwater monitoring is to be conducted including monthly <br /> measurements of groundwater depth. <br /> Upon approval of this work plan by the LOP agency a detailed budget will be prepared <br /> and submitted to the State USTCFP for pre-approval of the expenditures. <br /> r2937 Veneman Ave., #B240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />