Laserfiche WebLink
i <br /> DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> ' MONITORING WELL FIELD LOG 2004 <br /> :::::4::::: <br /> SAMPLELOCATION./,MW...•,•.., •::::::::6�.;.��:: ••�� DATE: <br /> • 6171200 <br /> ..•.•.•.......................................•.•.•........... . <br /> ........................ <br /> ' PROJECT NAME: CUTTER LUMBER ANALYSIS PERFORMED: SEE CHAIN OF CUSTODY <br /> ADDRESS: 3430 S.ELDORADO SAMPLE TIME: 13.38 <br /> CITY,STATE: STOCKTON,CALIF. SAMPLE CONTAINERS: 2 VOA'S <br /> ' SITE CONTACT: PRESERVATIVES: HCL <br /> CONSULTANT: GEO-PHASE ENVIRONMENTAL LAB.ANALYSIS BY: SHERWOOD <br /> ..•.•.•. ................................................. . <br /> ' PROJECT MANAGER: STEVE LANKFORD MONUMENT: FLUSH <br /> SAMPLER: DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED: WELL CASING DIA. . 2" / 0.1632 <br /> SAMPLE MEDIA: GR WATER P.I.D.READING/ODOR: NIA HEAVY FUEL <br /> TOP OF CASING ELEVATIO : MSL COLOR: GREY <br /> DEPTH TO WATER: feet.100th's 33.50 FEET CALC.PURGE VOL.: 1.91 GAL. <br /> DEPTH OF WELL: feet.100th's 45.23 FEET TOTAL VOLUME PURGED: 5.74 GAL. <br /> STANDING WATER COLUMN: 11.73 FEET DEPTH OF PUMP: NIA FEET <br /> ........................ <br /> FIELD PARAMETERS <br /> Fs <br /> • • • .�.DRAW•••, •• _ ,•• ' ....' <br /> ..... ... .•� �• . .'... <br /> .. . .. . <br /> TIME CUMULATIVE SUBMERSpHE.C. TEMP. O.R.P.•••••••DISSOLVED' TURBIDI <br /> TY. <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (D.T.W.) (GPM/LpM) (units) (UsMHOS) (Celsius) (Mvolts) (PPM) (N.T.U.) <br /> 0 NIA .5 GPM 7.10 1489 20.1 -48 1.07 1 GREY <br /> 1.91 7.08 1376 20 -56 0.69 " <br /> 3.83 7.08 1384 20 -60 0.87 " <br /> ' 5.74 7.08 1412 20.1 -64 0.64 " <br /> •��•.� •�•��. <br /> PURGE METHOD: DEDICATED WATERRA PUMP. <br /> SAMPLE METHOD: DEDICATED WATERRA PUMP. <br /> ' D.T.W.AFTER PURGE: D.T.W.AT SAMPLE TIME: 35.21' <br /> WELL INTEGRITY: CAP&SEAL ARE SECURE. AMERICAN LOCK INSTALLED. <br /> WELL LOCATION: SEE SITE MAP. <br /> ' REMARKS: <br /> WEATHER: CLEAR SKIES. WIND: NW5 <br /> QUALITY CONTROL: ALL PURGING E UIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> ' FIELD WITH A STEAMCLEANER&ALCONOX SOAP. NEW NITRILE GLOVES. <br /> CONTAINMENT: D.O.T. 1755 GAL.STEEL DRUM OR 60 GAL.POLYDRUM. <br /> INSTRUMENTATION: Y.S.I.3560 FLOWCELL Y.S.T.DISSOLVED OXYGEN METER <br /> I SOLMST SLOPE METER TIiERMODINE 580E P.I.D. <br /> KECK INTERFACE METER TURBIDITY METER <br />