My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
WORK PLANS CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 1:49:12 PM
Creation date
7/30/2019 1:37:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEO-PHASE <br /> ENVIRONMENTAL <br /> Report <br /> Groundwater Monitoring & Service Well Abandonment <br /> Western Lift/Cutter Lumber- Case 2 <br /> 3430/3930 S. El Dorado Street <br /> Stockton, California <br /> GPE Project No. 102.3 <br /> CWRCB GID Code T10000004185 <br /> March 28,2014 <br /> 1.0 INTRODUCTION <br /> This report documents the final abandonment (destruction) of sixteen former groundwater <br /> monitoring and service wells located on the site. This work was completed on January 31, <br /> 2014. <br /> 1.1 Site History <br /> The Case 2 release site has been the target of a remedial investigation of a gasoline release <br /> that was first discovered in 1996. Between 2005 and 2012,. an active remedial system was <br /> operated to mitigate the release. In 2013, a Closure Report was issued and the request for <br /> closure was approved and the approval was confirmed by the RWQCB subject to final <br /> well destruction and equipment dismantling. This report documents the well destruction <br /> that took place in the last week of January of this year. <br /> 1.2 Scope of Work <br /> The following work was completed during field activities associated with this Scope of <br /> Work. <br /> 1. Obtain a permit to destroy the monitoring and service wells. <br /> 2937 Veneman Avenue, Suite B240 Geo-Phase Environmental Inc. Phone: (209) 569-0293 <br /> Modesto. Ca 95356 Fax: (209) 569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.