My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
WORK PLANS CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 1:49:12 PM
Creation date
7/30/2019 1:37:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Specific Health And Safety Plan <br /> Cutter Lumber Products <br /> 4004 S. Eldorado Street <br /> Stockton California <br /> Geo-Phase Environmental, Inc. <br /> Start Date: September 2013 <br /> Scope of Work:Abandon 16 Monitoring and Service Wells <br /> I. Introduction <br /> This document is the site-specific health and safety plan (HSP) covering the soil and <br /> groundwater sampling field work associated with the attached Work Plan. This plan describes <br /> measures designed to assure worker protection from adverse exposure to site contaminants or <br /> wastes and other potential hazards. <br /> Project Background <br /> The subject site, Cutter Lumber Products, is a manufacturer of wood pallets. Formerly it was the <br /> site of a grain mill engaged in manufacturing food products. It operated a cluster of 5 USTs. <br /> Since 1991, when a leak was discovered, the site has been the target of a remedial investigation, <br /> but the investigation has been deemed complete and has been approved for closure. The work <br /> being conducted is part of the removal activities or the remedial system. <br /> Key Personnel&Responsibility <br /> The following table summarizes the personnel expected to participate in the field work and their <br /> respective responsibilities and authority: <br /> Person Affiliation Responsibility <br /> Steve Lankford Geo-Phase Environmental Inc. Exercises Overall Management&Site Safety <br /> V&W Driller V&W Drilling Safe and Proper Well Abandonment <br /> Harlin Knoll San Joaquin Co. EHD Regulatory Oversight, <br /> PeteHale Cutter Lumber Products Management of Manufacturing Operations <br /> The Site Safety Officer(Steve Lankford)has the-responsibility to: <br /> A Implement the HSP. <br /> B Monitor compliance with the HSP. <br /> O Provide or coordinate training. <br /> O Conduct air monitoring as required. <br /> ® Coordinate the medical monitoring program <br /> • Temporarily suspend field activities if the health and safety of the personnel are <br /> endangered. <br /> • Excusean individual from the site for infractions of the HSP. <br /> ® Upgrade protection levels as required. <br /> ® Coordinate use and maintenance of air monitoring equipment and personal protective <br /> equipment. <br /> ® Monitor worker use of personal protective equipment and direct upgrade or downgrade <br /> according to criteria established in the HSP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.