Laserfiche WebLink
t � i <br /> J � V <br /> IV. Site Control <br /> Exclusion Zone <br /> The exclusion zone is where contamination does or may occur.. Each excavation or soil boring <br /> area will be designated as an Exclusion Zone. Geo-Phase Environmental Inc. personnel and <br /> subcontractors have the authority to enter this zone. Governmental regulatory personnel also <br /> may enter. All other persons are to be kept out of the exclusion zone. <br /> Contamination Reduction Zone <br /> The Contamination Reduction Zone is the transition area between the Exclusion Zone and the <br /> clean area. The decontamination of drilling, sampling and personnel protective equipment will <br /> take place in the Contamination Reduction Zone. Personnel leaving the Exclusion Zone are to <br /> go directly to the decontamination area and follow ..the procedures as outlined in the <br /> Decontamination Procedures section of this Plan. <br /> Support Zone <br /> The Support Zone is a clean area where equipment, supplies, materials, vehicle keys, and the Site <br /> Safety Plan are kept. Personnel may.wear normal work clothes within this zone. Any potentially <br /> contaminated clothing, equipment, or samples must not be brought into the Support Zone. This <br /> area is to be delineated with markers, barricades and signs to keep unwanted bystanders out of <br /> the area. <br /> V. Training <br /> OSHA regulations under Title 29 CFR, Part 1910.120 include training requirements applicable to <br /> all employees who may be exposed to hazardous waste sites, although this site is nit known to <br /> fall into that category. Nevertheless, site workers will have completed 40 hours of HAZWOPR <br /> training with 8-hour annual refresher courses. <br /> The Site Safety Officer will regularly hold safety meetings with drilling personnel or other <br /> contractors, which will include, but not limited to, potential routes of exposure; types, uses, and <br /> limitations of personal protective clothing including respirators; and proper decontamination <br /> procedures. A safety meeting will be held prior to work each day, if the work plan has been <br /> altered, and when new personnel join the work team. <br />