Laserfiche WebLink
P <br /> Addendum to Corrective ActionT[an Page 7 <br /> Fonner Manna Pro Site <br /> Project No.207.3 <br /> February 10,2009 <br /> 5.4 SOIL& GROUNDWATER SAMPLING & ANALYSIS PROCEDURES <br /> 5.1 Soil Sample Analysis & Analysis <br /> Soil samples selected for.anal g a P'analysis will be collected using split spoon sampling E <br /> _ P y _ P P g tool.and <br /> tested as described in the original CAP. It is anticipated that as many as four samples <br /> from each boring will be selected for laboratory analysis. Samples will be tested for <br /> gasoline-range petroleum hydrocarbons and BTEX compounds. <br /> 5.2 Groundwater.Sample Collection and Analysis <br /> Itis not anticipated that groundwater samples will be collected from the newly installed <br /> remedial system service wells. <br /> I <br /> f <br /> M <br /> N <br /> i <br /> i. <br /> r II <br /> L <br /> 2937 Veneman Ave., 4B240 Geo-Phase Environmental Inc. Phone(209) 569-0293 <br /> Modesto,CA 95356 Fax (209)569-0295 <br />