My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:03:41 PM
Creation date
7/30/2019 1:45:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> GEO-PHASE <br /> 5 <br /> - ENVIRONMENTAL <br /> IL <br /> February 10, 2009 <br /> Mr. Tom Altweiss <br /> Manna Pro Corporation <br /> 707 Spirit 40 Park Drive, Suite 150 <br /> St. Louis, Missouri 63005 <br /> I L <br /> RE: Corrective Action Plan_ Addendum <br /> Former Manna Pro Site,4004 S. EI Dorado,Boulevard Stockton,California(Site Code 1088) <br /> Dear.Mr. Altweiss: <br /> On February 16, 2001 Geo-Phase Environmental Inc. submitted a document entitled Corrective Action <br /> Plan, Former Manna Pro Site (CAP). The purpose of the CAP was to describe the methods and <br /> :procedures to be employed to mitigate the.gasoiine impacted soil and groundwater at the subject site. <br /> The construction work and system start-up was documented in Report- Va or Extraction/Air Sparge <br /> Remedial S stem Construction Former Manna Pr6 Site, and which is dated September 26, 2003.. The <br /> remedial system has now been operating for almost 4 years. This current document is an addendum to <br />€ the CAP, and it proposes the addition of two new wells to the remedial system. <br /> L 1 <br /> Since r,e y, <br /> Geo-Phase Environm 1 Inc. . <br /> Stephen M. Lankford, PG; REA <br /> President <br /> cc: Harlan Knoll; San Joaquin Co.,PHS/EHD <br /> Tony Palma,Cutter Lumber Products <br /> i <br /> 2937 Veneman Ave.,#B240 Geo-Phase:Environmental Inc. Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.