My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:03:41 PM
Creation date
7/30/2019 1:45:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 Pa <br /> Addendum to Corrective Action Plan � g <br /> Former Manna Pro Site <br /> Project No.2073 <br /> February 10,2009 <br /> 3.0 VAPOR EXTRACTION& SPARGE WELL CONSTRUCTION <br /> As suggested above, the work will entail the construction of one vapor extraction well <br /> and one new air sparge well. Proposed locations are shown on the attached Figure 2. <br /> 3.1 Soil Boring Installation. <br /> Additional soil borings will be installed in the area of the release and will be converted to <br /> the appropriate service wells. The new sparge well will be drilled with a S inch o.d. <br /> hollow stemmed auger operated by a C757 licensed. drilling contractor. The vapor <br /> extraction wells will be constructed with 12-inch augers. During drilling, the borings will <br /> be logged and sampled by a professional-geologist supervised by a registered geologist. <br /> The approximate depths of the borings will be as follows: <br /> r Well Bor-ing Diameter Boring Depth <br /> 1 Vapor Extraction Well 12 inch 35 feet <br /> 1 Air Sparge Well S inch 50 feet <br /> ` Soil sample collection procedures are described in the original CAP <br /> 3.2 Vapor Extraction Well Construction <br /> The new vapor extraction wells will.be constructed as outlined in the following table and <br /> as more fully described in the original CAP. <br /> Casing 4 inch Flush Joint Schedule 40 PVC <br /> Screen 0.010 inch slotted 4 inch Schedule 40 PVC <br /> Screened Interval 15-35 feet below ground surface (bgs) <br /> Filter Pack 1335 feet bgs <br /> Filter Pack Material, #3 Monterey sand <br /> Bentonite Transition Seal 13=10 feet bgs <br /> Class G Neat Annular Seal 0=10 feet bgs <br /> 3.3 Air Sparge Well Construction <br /> The new sparge .well will be constructed as outlined.in the following table and as more <br /> fully described in the original CAP. . <br /> Casing 2" Flush Joint Schedule 40 PVC <br /> Screen 0.010 Slotted Schedule 40 PVC <br /> Screened Interval 45-50 feet below ground surface (bgs) <br /> Filter Pack 43-50 feet bgs <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental.Inc. Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.