Laserfiche WebLink
!JJ V <br /> ri <br /> f <br /> Thomas Altwies <br /> 't Manna Pro Products, LLC <br /> 707 Spirit 40 Park Drive, Suite 150 <br /> Chesterfield, MO 63005 <br /> RE: :4004 S. EI Dorado, Stockton, CA Site Code: 1088 <br /> WORK PLAN. Monitoring Well Destruction/Decommissioning. <br /> 1 <br /> DATED: March 30, 2012.- <br /> PREPARED <br /> 012.-PREPARED BY: GeoPhase Environmental <br /> APPROVED: [X] <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10 (c)(3.)]: <br /> 1. To destroy 3k1ells <br /> n-site and off-site monitoring and remediation wells. <br /> re2. To over-boin contaminated source areas and pressure grout well in <br /> uncontaminated.areas outside source area. <br /> 3. To seal wells by over-boring from total depth to 3 feet below surface grade with neat <br /> cement. <br /> 4. When using-piessure grouting,rernove casing 2.5 feet to-below.surface grade and seal <br /> wells from total depth 6 inches above the well casing to two feet below ground surface <br /> with neat cement <br /> 5. To provide the EHD a Well.Destruction Report upon completion of the proposed work. <br /> COMMENTS AND CONDITIONS: <br /> -1. To clear wells to the required depth below ground surface before drilling. <br /> 2. To use only a neat cement slurry for sealing-wells and tremie placement where <br /> necessary. <br /> 3. To obtain all required Permits prior to beginning work., <br /> 4. To provide the EHD a Well Destruction Report within 90 days of work completion. <br /> 5. To remove all equipmentand affected material within 90 days of well destruction. <br /> DATED 1Z BY <br /> Harlin Knoll, Senior RENS (209) 468-34.4.2 <br /> Cc: GeoPhase-Envionmental, 2937 Veneman Ave., Suite B240, Modesto, CA 95356 <br />