My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 2:00:36 PM
Creation date
7/30/2019 1:49:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!JJ V <br /> ri <br /> f <br /> Thomas Altwies <br /> 't Manna Pro Products, LLC <br /> 707 Spirit 40 Park Drive, Suite 150 <br /> Chesterfield, MO 63005 <br /> RE: :4004 S. EI Dorado, Stockton, CA Site Code: 1088 <br /> WORK PLAN. Monitoring Well Destruction/Decommissioning. <br /> 1 <br /> DATED: March 30, 2012.- <br /> PREPARED <br /> 012.-PREPARED BY: GeoPhase Environmental <br /> APPROVED: [X] <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25296.10 (c)(3.)]: <br /> 1. To destroy 3k1ells <br /> n-site and off-site monitoring and remediation wells. <br /> re2. To over-boin contaminated source areas and pressure grout well in <br /> uncontaminated.areas outside source area. <br /> 3. To seal wells by over-boring from total depth to 3 feet below surface grade with neat <br /> cement. <br /> 4. When using-piessure grouting,rernove casing 2.5 feet to-below.surface grade and seal <br /> wells from total depth 6 inches above the well casing to two feet below ground surface <br /> with neat cement <br /> 5. To provide the EHD a Well.Destruction Report upon completion of the proposed work. <br /> COMMENTS AND CONDITIONS: <br /> -1. To clear wells to the required depth below ground surface before drilling. <br /> 2. To use only a neat cement slurry for sealing-wells and tremie placement where <br /> necessary. <br /> 3. To obtain all required Permits prior to beginning work., <br /> 4. To provide the EHD a Well Destruction Report within 90 days of work completion. <br /> 5. To remove all equipmentand affected material within 90 days of well destruction. <br /> DATED 1Z BY <br /> Harlin Knoll, Senior RENS (209) 468-34.4.2 <br /> Cc: GeoPhase-Envionmental, 2937 Veneman Ave., Suite B240, Modesto, CA 95356 <br />
The URL can be used to link to this page
Your browser does not support the video tag.