Laserfiche WebLink
t <br /> s"F ,X•..r-.-.�iY,4.'...sn..',, f.,'.s..._.:.,.T" ,`�....YY,:....irr,'.,�i,�I, �'L.a r'.I.. ,.3... _ ,...'�' tir,.r,.�;r_,n�?�;fd3:,'-'��t r`v�.4. 6 <br /> ,�.'1`t7ry <br /> � <br /> '5 <br /> `l # <br /> "' <br /> ��r<-'r•? —�r[.�si �''a'r- .,.d .ca...;.1 �".,. ;,.-�,. '� ,_, ,{�!� .e� -r- f .ti� :�' :ir<.- x"". - '",:� :t>- .� =�sil�. <br /> ,� �� t.�,t�i,t x.r r:, y�ra,r :.ice, �%,� 4-� �`"?h�;.*�r�r `r°rte L•+`�"" 1,, F>x ¢�•� L; � t.' '' ;yr,. ., r�.S:F t, r sx`',�,' :cam_.!#+F.: <br /> 4 - f <br /> r ,.. <br /> SECTION 1 <br /> INTRODUCTION <br /> This document is the Workplan for a Soil <br /> Invand Groundwater <br /> Investigation of the site located at 4004 El Dorado Street,Stockton, San <br /> Joaquin County, California, <br /> Site Baekgmund <br /> The Manna Pro facility consists of a feed mill and warehouse located <br /> on El Dorado Street in Stockton, California (M <br /> no longer in operation and a portion of the warehouse I being The eased <br /> to a tenant. A Phase II site audit was <br /> Environmental Consultants in Feb <br /> five underground fuel tanks wti conducted by WHF <br /> ed 0- During <br /> hesite northwest corner <br /> of the property. ere iden <br /> The fuel tanks were removed by SE <br /> AjC0 (a WHF) in <br /> June 1990, Diesel and gasoline contamination was found in the <br /> underlying soils after the tanks were removed. Contamination was <br /> also found underneath the fuel Pumps, to the southeast of the tanks. <br /> A moved y Bar, workplan was prepared b <br /> ~� y WHF in July 1590 and <br /> approved by San Joaquin County. Appro mately 9,;00 cubic yards of <br /> sail were then excavated from the area and stockpiled b site. o <br /> addendum io the re-excavation workplan calling for removal it 5 00 <br /> cubic yarns of soil was filed with San Joaquin Co <br /> 12, 1990,and was a q qty on Septernberr <br /> , approved by the County. <br /> Before Proceeding <br /> for Manna Pro)contracted eexcavation, <br /> ith ERM-West tto review y& Myers(attorneys <br /> work performed to date and provide reco w the status of the <br /> mti activities at the site. ERM-West recommendedrcommendations for future <br /> be done to determine the extent of soil coinationestig tion <br /> Proceeding further with Prior to <br /> of <br /> Accordingly, additional excavation ofthe i,,- contaminated was done October soil. <br /> 1990 under the auspices of the approved September 12 workplan <br /> addendum, Additional contaminated soil pths from <br /> I5 feet to 35 feet in the esting excavation was found at deasmore fully described in <br /> the ER-NI-West report filer] with San Joaquin County on OctoUer 15 <br /> 1990 <br /> 1-1 <br />