Laserfiche WebLink
J <br /> c.1 <br /> _ Addendum to the Soil and Groundwater investigation Workplan <br /> for the Manna Pro facility at 4004 El Dorado Street,Stockton <br /> Page 2-3: Brass tubes containing soil samples for laboratory analysis <br /> will be sealed with Teflon tape, capped with plastic caps, and . <br /> taped around the edge of the plastic cap with duct tape. <br /> Page 2-4: Every four samples will be composited to produce a total of 25 <br /> samples for laboratory analysis or 1 sample for each 100 yards <br /> - of stockpiled soil. <br /> - in addition, three 4-inch monitoring wells will be constructed around the <br /> " existing excavation. The exact locations and screened intervals of these <br /> wells will be determined in the field pending results of initial boring <br /> installation, soil sampling, and hydropunch groundwater sampling. The <br /> amended Figure 2-1 (attached) shows possible locations for these wells. <br /> El-W-West <br /> 7 November 1990 <br /> i <br />