My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009405
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009405
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:04:06 PM
Creation date
7/30/2019 2:00:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009405
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION I <br /> two INTRODUCTION <br /> This document is the Workplan for a Soil and Groundwater <br /> �. Investigation of the site located at 4004 El Dorado Street, Stockton, San <br /> Joaquin County, California. <br /> Site Background <br /> +- The Manna Pro facility consists of a feed mill and warehouse located <br /> on El Dorado Street in Stockton, California (Figure 1-1). The mill is <br /> no longer in operation and a portion of the warehouse is being leased <br /> �- to a tenant. A Phase II site audit was conducted by WHF <br /> Environmental Consultants in February 1990. During the site audit <br /> five underground fuel tanks were identified in the northwest corner <br /> of the property. <br /> The fuel tanks were removed by SEMCO (a subcontractor to WHF) in <br /> June 1990. Diesel and gasoline contamination was found in the <br /> underlying soils after the tanks were removed. Contamination was <br /> also found underneath the fuel pumps, to the southeast of the tanks. <br /> A re-excavation workplan was prepared by WHF in July 1990 and <br /> approved by San Joaquin County. Approximately 2,500 cubic yards of <br /> soil were then excavated from the area and stockpiled on site. An <br /> addendum to the re-excavation workplan calling for removal of 5,000 <br /> cubic yards of soil was filed with San Joaquin County on September <br /> 12, 1990, and was approved by the County. <br /> Before proceeding with the excavation, O'Melveny & Myers (attorneys <br /> for Manna Pro) contracted with ERM-West to review the status of the <br /> work performed to date and provide recommendations for future <br /> activities at the site. ERM-West recommended that an investigation <br /> be done to determine the extent of soil contamination prior to <br /> proceeding further with excavation of contaminated soil. <br /> Accordingly, additional excavation of the site was done October 11, <br /> 1990 under the auspices of the approved September 12 workplan <br /> addendum. Additional contaminated soil was found at depths from <br /> �.. 15 feet to 35 feet in the existing excavation as more fully described in <br /> the ERM-West report filed with San Joaquin County on October 15, <br /> 1990, <br /> L <br /> 1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.