Laserfiche WebLink
V <br /> WHF to Berry Seed and Feed on February 10, 1990 A copy of the <br /> report is contained as Appendix A to this report <br />' In July 1990, the five underground storage tanks were removed by <br /> SEMCO of Modesto, California, under contract to WHF Ten soil <br /> samples were collected during the removal of the underground fuel <br />' tanks, one at each end of the five tank excavations These samples <br /> were analyzed for TPH as gasoline and diesel, as well as BTEX A <br /> concentration of 900 mg/kg of diesel was detected in the sample <br />' collected near the south end of the 10,000-gallon diesel tank <br /> referenced as tank #2 in Table 1-1 A concentration of 3,000 mg/kg of <br /> diesel was detected near the south end of the 10,000-gallon diesel tank <br /> referenced as tank #3 in Table 1-1 Gasoline and diesel were detected <br /> in the soil samples collected near the north and south ends of the <br /> 5,000-gallon diesel tank referenced as tank # 4 in Table 1-1 Gasoline <br /> and diesel were also detected in the soil sample collected near the <br />' west end of the 5,000-gallon diesel tank referenced as tank #5 in Table <br /> 1-1 The tank removal procedures and analytical results are <br /> presented in the report entitled "Re-excavation Work Plan", which <br /> was prepared by WHF and submitted on July 24, 1990 A copy of the <br /> workplan as included in Appendix B to this report <br /> Re-excavabon W r I W'HF <br /> During July 1990, in response to the detection of <br /> petroleum <br /> hydrocarbons during the removal of the underground storage tanks, <br /> WHF proposed to excavate soil in this area to a depth of 20 feet It was <br />' anticipated that approximately 2,100 cubic yards of soil would be <br /> excavated This proposal, the "Re-excavation Workplan," was <br /> submitted by WHF to San Joaquin County during July 1990 and �as <br /> subsequently approved This workplan is contained in Appendix B to <br /> this report Approximately 2,500 cubic yards of soil were excavated <br /> from the area and stockpiled on-site An Addendum to the "Re- <br /> excavation Workplan" was submitted by WHF to San Joaquin County <br /> on September 12, 1990 and was also subsequently approved <br /> . -Y, <br /> st <br /> During October 1990, ERM-West recommended that an investigation <br />' be done to determine the extent of soil contamination prior to <br /> proceeding further with excavation of contaminated soil On October <br /> 11, 1990, ERM-West performed soil sampling around the excavation <br />' This sampling was performed by excavating slots into the walls of the <br /> existing excavation using a backhoe This methodology was used <br /> following an excavation workplan prepared by WHF that had already <br /> 1-3 <br /> 1 <br />