My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009446
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:31:52 PM
Creation date
7/30/2019 2:07:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009446
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drill Cuttings <br /> Drill cuttings were segregated and stockpiled along with the existing <br /> stockpiled soil <br />' Abandonment of Bore Holes <br />' AlI bore holes were backfilled with a grout mix consisting of sand, <br /> cement, bentonite powder, and clean water in the following ratios <br /> One 94-pound sack of Portland cement, <br /> Two sacks of Lonestar 120 sand, <br />' • 5 pounds of bentorute powder, and <br /> • 4 5 to 6 5 gallons of clean water <br /> Water Level Measurements <br /> Groundwater elevations were measured in the three developed <br /> monitoring wells The elevations of the tops of the casings were <br /> surveyed in relation to a permanent on-site reference point Water <br /> levels were determined using the wetted tape method to reference the <br /> depth to groundwater to the top of the surveyed well casing All <br /> water levels were measured at the same time The water elevations <br /> were used to determine the groundwater gradient and direction of <br />' flow <br /> Groundwater Sample Collection <br /> A hydropunch was used to collect groundwater samples in the <br />' bonngs The method allows the sampling of groundwater without <br /> the necessity of well installation The hydropunch employs a probe <br /> made of 2-inch steel tube equipped with a detachable penetration <br />' cone The probe is driven into the formation material in advance of <br /> hollow stem augers The probe is then retracted from the cone to <br /> expose a screen to the potential water bearing zone Water samples <br />' are collected with a Teflon bailer, which is introduced into the probe <br /> Exact locations for collection of groundwater samples with the <br /> hydropunch were made in the field based on results of analyses of <br />' soil samples Hydropunch samples were used to assess the nature <br /> 23 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.