My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009446
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:31:52 PM
Creation date
7/30/2019 2:07:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009446
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Pian for Characterization and Remediation of Stockpiled Soils July 30, 1992 <br /> Manna Pro Facility, 4004 © Dorado Street, Stockton, CA 7 <br />' cubic yards. Laboratory analytical methods will be identical to those descnbed for the <br /> characterization soil sampling The results of the confirmation sod sampling will be reported to the <br />' appropriate regulatory agencies for review, and, rf the confirmation sampling meets all target criteria <br /> described in Task 1, then the remedcated sod will be used to complete the tank pit backfilling <br />' actr4ies <br /> Task 5: Backfilling and Compaction <br /> After receiving regulatory confirmation that the remediated sod has met all target criteria, earthwork <br /> Iwill commence to transfer soil to the tank pit excavation Backfilling will proceed in the manner <br /> prescribed under Task 2 of this work plan <br /> ITask 6: Final Report <br /> Groundwater Technology will prepare a final report describing the sod characterization, remediation <br /> activities, and confirmation sampling The final report will also document the backfilling procedures <br /> and results The report will include field observations, laboratory analytical reports and compaction <br /> testing results The final report will be submitted to the appropriate regulatory agencies <br /> Task 7: Project Schedule <br /> Groundwater Technology is prepared to begin the preparation phase of this project immediately <br /> upon approval of SJCPHS It is estimated that remediation of the impacted sods will require a <br /> maximum of approximately four months to complete Assuming that the appropriate regulatory <br /> approvals are obtained in a timely manner, it is estimated that backfilling and final reporting for the <br /> project could be completed within six months of project start <br /> 4.0 CLOSURE <br /> To ensure that this work plan is in agreement with the SJCPHS goals for the Manna Pro Facility site, <br /> Groundwater Technology requests written approval of this work plan before proceeding with the <br /> proposed scope of work <br /> II <br /> ^T;'GROUNDWATER <br /> _--___TECHNOLOGY, INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.