My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009450
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009450
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:16:59 PM
Creation date
7/30/2019 2:12:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009450
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manna Pro Feed Mill <br /> Site Safety Plan <br /> �une 10, 1991 <br /> 3.0 INTRODUCTION , <br /> 3.1 Background <br /> Manna Pro has retained Groundwater Technology, Inc. to perform a site <br /> assessment/investigation and sampling at their Manna Pro facility <br /> located at 4004 E1 Dorado Street, Stockton, California. <br /> Warehouse and associated grain storage, property is primarily flat with <br /> paving directly around the on-site structures. Railroad tracks are <br /> adjacent to the site to the east, El Dorado Street is to the west. An <br /> undeveloped field is to the south, a warehouse is to the north. <br /> 3.2 Purpose <br /> The purpose of the site safety plan is to provide Groundwater <br /> Technology field personnel and subcontractors with an understanding of <br /> the potential chemical and physical hazards that exist or may arise <br /> while the tasks of this project are being performed. <br /> This SSP describes the procedures to be followed in order to reduce <br /> employee exposure to potential health hazards which may be present at <br /> the project site. The emergency response procedures necessary to <br /> respond to such hazards are also described within this SSP. <br /> 3.3 Obiective <br /> The primary objective is to ensure the well-being of all field <br /> personnel and the community surrounding this site. In order to <br /> accomplish this, project staff and approved subcontractors shall <br /> acknowledge and adhere to the policies and procedures established <br /> herein. Accordingly, all personnel assigned to this project shall read <br /> this site safety plan and sign the Agreement and Acknowledgement <br /> Statement (Appendix A) to certify that they have read, understood and <br /> agreed to abide by its provisions. <br /> GTI personnel have the authority to stop work performed by our sub- <br /> contractors at this site if any work is not performed in accordance <br /> with the requirements of this Site Safety Plan. <br /> 3.4 Amendments <br /> Any changes in the scope of work of this project and/or site conditions <br /> must be amended in writing on the Site Safety Plan Amendment Sheet <br /> (Appendix B) and approved by Health & Safety Manager. <br /> 5 EO- GROUNDWATER <br /> ISI!Ii 1 TECHNOIACY, INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.