Laserfiche WebLink
Manna Pro Feed Mill <br /> Site Safety Plan <br /> �une 10, 1991 <br /> 4.0 HAZARD EVALUATION <br /> 4.1 Site Conditions <br /> Potential physical hazards during site operations are anticipated to <br /> include: <br /> • Drill rig <br /> • Noise <br /> • Traffic <br /> • Underground/overhead utilities <br /> • Backhoe <br /> • other construction equipment (if yes, list: ) <br /> trucks fork lifts <br /> • Hot work - welding/cutting <br /> • Heat/cold stress <br /> • Excavation(s) > 4 feet (if yes, describe: ) <br /> 20 feet properly sloped <br /> • Live electrical circuits <br /> • Hot surface <br /> • Low light conditions <br /> • Lifting hazard <br /> • Slip/trip/fall <br /> • Asbestos, unknown at this time <br /> 4.2 Site Tasks <br /> The field tasks at this site are anticipated to include: <br /> ♦ Drilling/Soil boring <br /> ♦ Monitoring well installation <br /> ♦ Recovery well installation <br /> ♦ Well survey <br /> ♦ Well gauging <br /> ♦ Well development <br /> ♦ Product bailing <br /> ♦ Groundwater sampling <br /> ♦ Soil sampling <br /> ♦ Excavation/trenching <br /> ♦ Equipment installation <br /> ♦ operation and maintenance `J GROUNDWATER <br /> 6 ��TECHNOLOGY, INC <br />