My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009475
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009475
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:10:02 PM
Creation date
7/30/2019 2:20:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009475
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pilot Testing Report and Conceptual Corrective Action Plan July 15, 1994 <br /> Manna Pro, 4004 South EI Dorado, Stockton, CA 25 <br /> one-year groundwater capture zone of approximately 460 feet by 360 feet at a combined pumping <br /> rate of about 6 6 gpm <br /> To address the areas detailed in Figure 11, the following remedial well field construction Is proposed <br /> at this time <br />' - 20 HVE Extraction Points <br /> • 3 Groundwater Pumping Wells <br /> A layout of the HVE extraction points (including the effective radii of influence of each point) and the <br /> groundwater pumping system conceptual layout (including flowlines Illustrating the combined <br /> one-year capture zone) is presented as Figure 12 A conceptual operating schematic of the <br /> combined groundwater pumping and HVE extraction system is provided as Figure 13 <br /> The HVE extraction points will be plumbed into a vacuum manifold and fed into the liquid rin9pump <br /> The HVE points will be adapted with a tee connection to allow vertical access to the points <br /> Vacuum gauges and flow meters will be used to regulate extraction rates and optimize system <br />' performance Design details will be addressed in the final system design <br /> A conservative estimate of the volume of water moving through the hydrocarbon impacted area of <br /> the Manna Pro property may be calculated using the average groundwater gradient measured from <br /> MW-4 to MW-8 on February 3, 1993 (0 004 feet/feet), the average conductivity of the aquifer as <br /> determined by the pumping test (74 gallons/day ft2), the maximum width of the impacted area <br /> perpendicular to groundwater flow direction (400 feet), and an impacted aquifer thickness of 10 feet <br /> Using these parameters in the Darcy flow equation indicates a maximum flow rate across the <br /> impacted area of the property of 1184 gpd or approximately 0 82 gpm <br /> With a drawdown of approximately 5 3 feet, one recovery well can be expected to yield <br /> approximately 1 3 gpm As an approximation, the yield of this well per linear foot of drawdown <br /> equates to 0 22 gpm/ft A drawdown of 10 feet in a recovery well can be expected to yield <br /> approximately 2 2 gpm To conservatively estimate the number of wells required to produce a <br />' negative net flow of groundwater across the hydrocarbon impacted zone of the property shown in <br />' zaysaoaa azo <br /> GROUNDWATER <br />' TECHNOLOGY, INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.