Laserfiche WebLink
AZURE ENVIRONMENTAL <br /> I4.0 TECHNICAL STATUS REPORT <br /> Work Com leted Duran the Third carter i 996 <br /> Work completed during the third quarter included performance of the quarterly ground-water <br />' morutoring program <br /> J <br /> On September 5, 1996 soil samples were collected at 10 locations within the soil treatment cell at <br />' the Site The samples were collected and analyzed in accordance with the scope of work <br /> described in the document entitled "Proposed Workplan to Conduct Soil Sampling for Soil <br /> Treatment Cell Closure", submitted to the San Joaquin County Public Health Services on <br />' August 19, 1996 <br /> Work Expected to be Completed During the Fourth Quarter 1996 <br />' Work expected to be completed during the fourth quarter includes continued performance of the <br /> quarterly ground-water monitoring program <br />' During the fourth quarter, Azure expects to evaluate soil sampling results and finalize a report for <br /> closure of the soil treatment cell A soil closure report is expected to be completed and submitted <br /> to the San Joaquin County Public Health Services during November 1996 <br /> I <br /> 3 <br /> I <br />