My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009481
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:06:09 PM
Creation date
7/30/2019 2:26:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009481
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AZURE ENVIRONMENTAL <br /> I4.0 TECHNICAL STATUS REPORT <br /> Work Com leted Duran the Third carter i 996 <br /> Work completed during the third quarter included performance of the quarterly ground-water <br />' morutoring program <br /> J <br /> On September 5, 1996 soil samples were collected at 10 locations within the soil treatment cell at <br />' the Site The samples were collected and analyzed in accordance with the scope of work <br /> described in the document entitled "Proposed Workplan to Conduct Soil Sampling for Soil <br /> Treatment Cell Closure", submitted to the San Joaquin County Public Health Services on <br />' August 19, 1996 <br /> Work Expected to be Completed During the Fourth Quarter 1996 <br />' Work expected to be completed during the fourth quarter includes continued performance of the <br /> quarterly ground-water monitoring program <br />' During the fourth quarter, Azure expects to evaluate soil sampling results and finalize a report for <br /> closure of the soil treatment cell A soil closure report is expected to be completed and submitted <br /> to the San Joaquin County Public Health Services during November 1996 <br /> I <br /> 3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.