Laserfiche WebLink
Quarterly Groundwater Monitoring Report,January-March 1995 2 <br /> Manna Pro,4004 South El Dorado, Stockton, CA April 17, 1995 <br /> ■ submittal of the groundwater extraction and treatment system design to the San Joaquin <br /> County PHS <br /> Groundwater Monitoring Data <br /> On January 30, 1995, 10 existing groundwater monitoring wells were monitored for depth to water <br /> (DTW) DTW measurements were also taken from the groundwater extraction well (EW-1) and the <br /> three observation wells (013-1, OB-2, and 013-3) The DTW measurements were taken from surveyed <br /> points at the top of each well casing, which are referenced to an arbitrary datum (designated as 15 <br /> feet) The groundwater elevations this quarter increased an average of 3 11 feet since the <br /> October 1994 elevations were measured The results of groundwater monitoring are included in <br /> attachment 2, table 1 A potentiometric surface map, as interpreted from the data in table 1, is <br /> presented in figure 1 The groundwater elevation data collected from MW-1 was not used in the <br /> construction of the potentiometric surface map since it is believed not representative of the water <br /> level elevation conditions in the area As shown in figure 1, the average groundwater gradient in the <br /> site vicinity is approximately 0 005 foot/foot radiating from the area of former excavation The <br /> groundwater flow direction radiates from the former excavation area in a north-northwest direction <br /> Groundwater Quality Data <br /> The 10 monitoring wells were sampled on January 30, 1995 Before sampling, the static water in the <br /> well was purged to collect samples representative of aquifer conditions The pH, temperature, and <br /> conductivity were measured with a YSI 3650 meter during purging Equipment was cleaned after <br /> each sample was collected, using an Alconox and water solution and rinsed with de-ionized water <br /> Three well-casing volumes of groundwater were purged from the wells or purged until the well <br /> became dry The wells were allowed to recharge to approximately 80 percent of static water level <br /> before samples were collected <br /> Samples were collected using well dedicated, polyurethane, disposable bailers and placed into <br /> sample containers supplied by the laboratory performing the analyses Samples were labeled, <br /> placed in an Ice-chilled insulated chest and transported to GTEL Environmental Laboratones, Inc in <br /> Concord, California, accompanied at all times by a chain-of-custody record A trip blank was also <br /> collected and accompanied the samples for quality assurance and control <br /> 009OF4025 202 <br /> GROUNDWATER <br /> E2MTECHNOLOGY, INC <br />