Laserfiche WebLink
' Work Plan Page 22 <br /> Former Manna Pro Site <br /> t Project No 207 3 <br /> August 16, 1999 <br /> t7.3 Quarterly Monitoring <br />' A section of the report will be document the quarterly monitoring event based upon <br /> information collected during the next groundwater monitoring event Future groundwater <br />' monitoring events will be completed as described in Sections 6 2 2 and 6 5 2 <br /> Groundwater monitoring will be completed on a quarterly basis with the following well <br /> sampling schedule <br />' Quarterly_ Sem-Annually _ _ Annually <br /> MW-3 MW-1 MW-2 <br />' <br /> MW-9 MW-5 MW-4 <br /> MW-10 MW-6 <br /> MW-7 <br />' MW-8 <br /> Upon completion of each event, a quarterly groundwater monitoring report will be <br />' completed <br /> I <br /> I <br /> I <br /> 2937 Veneman Ave,#B240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209) 569-0295 <br />