Laserfiche WebLink
1 <br /> TABLE OF CONTENTS <br />' 1.0 INTRODUCTION <br /> 1 1 Site History <br />' 1 2 Current Site Status <br /> 13 Proposed Scope of Work <br /> 1 3 1 Conceptual Basis <br /> 1 3 2 Scope of Work <br />' 2.0 WATER WELL SURVEY <br /> 21 Records Search <br />' <br /> 22 Physical Search <br /> 23 Site Permitting <br /> 2 3 1 Well Installation Permits <br /> 2 3 2 Pilot Vapor Extraction Well Permuting <br />' 3.0 DEEPER GROUNDWATER CHARACTERIZATION <br />' <br /> 31 Soil Boring Installation <br /> 32 Deep Exploratory Monitoring Well Installation <br /> 33 Monitoring Well Construction <br />' <br /> 34 Monitoring Well Development <br /> 35 Well Survey <br /> 4.0 PILOT TESTING SYSTEM INSTALLATION <br /> 41 Soil Boring Installation <br /> 42 Pilot Remedial Well Construction <br />' 4 2 1 Vapor Extraction Well Construction <br /> 422 Air Sparge Well Construction <br /> 423 Air Monitoring Well Construction <br />' <br /> 424 ORC Slurry Installation <br /> 43 Well Development <br /> 44 Waste Disposal <br /> 5.0 PILOT TESTING SYSTEM INSTALLATION & OPERATION <br /> 51 Pilot System Installation <br /> 51 1 Internal Combustion Engine Installation <br /> 5 1 2 Sparge Pump Installation <br /> 52 Pilot System Operation <br /> 5 2 1 Soil Vapor Extraction System Start Up <br /> 522 Air Sparge System Start Up <br /> 53 Pilot System Monitoring <br /> 5 3 1 Process/Effluent Air Monitoring <br /> 5 3 2 Vacuum/Flow/Pressure Monitoring <br /> 533 In-Situ Groundwater Parameter Monitoring <br /> 2937 Veneman Ave,#13240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />