My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009538
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:27:22 PM
Creation date
7/30/2019 2:39:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009538
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Former Manna Pro Site <br /> Page 2 <br /> Quarterly Groundwater Monitoring Report <br />' Project No 207 2 <br /> February 11, 2003 <br />' Later, Groundwater Technology Inc (GTI) installed four additional monitoring <br /> wells, a combination groundwater/vapor extraction well and three observation <br />' wells These wells were used for the completion of groundwater pumping and <br /> vapor extraction pilot tests <br />' Between 1996 and April of 2000, the principal remedial activity consisted of <br /> groundwater monitoring In April of 2000, a deep monitoring well (MW-11) <br /> was constructed to characterize the vertical distribution of hydrocarbons in the <br />' subsurface At the same time, a new vapor extraction well and an air sparge <br /> well were constructed as part of a pilot remedial test program The <br /> construction of MWD-11 was documented in the quarterly monitoring report <br />' for the spring 2000 monitoring event The results of the pilot test were <br /> documented in the July 31, 2000 report entitled Repast, Remedial Action Pilot <br /> Study Former Manna Pro Site To date, a total of 11 groundwater monitoring <br />' wells, 5 observation wells, and three test wells have been constructed on or <br /> near the Manna Pro site <br />' The San Joaquin County EHD has concluded that the release at this site has <br /> been adequately characterized and directed that a Corrective Action Plan be <br /> prepared and implemented The first phase of an air sparge / vapor extraction <br /> system was constructed and operated for 90 days beginning on February 14, <br /> 2002 Based on the results of this work, a addendum to the Corrective Action <br /> Plan was prepared, and the addendum was recently approved The USTCFP <br /> has been asked to pre-approve the associated costs and their response is <br /> pending <br /> 1.2 Scope of Work <br />' The following work was completed during this round of groundwater <br /> monitoring <br /> 1 The depth to groundwater was measured in 10 monitoring wells, and 5 <br /> observation wells located on, or near the site <br />' 2 Groundwater monitoring included sample collection and subsequent <br /> laboratory analysis from 6 monitoring wells <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br />
The URL can be used to link to this page
Your browser does not support the video tag.