My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009539
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009539
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:27:35 PM
Creation date
7/30/2019 2:39:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009539
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Manna Pro Site Page 6 <br /> Quarterly Groundwater Monitoring Report <br /> Project No 207 2 <br /> November 4, 2002 <br /> I3.0 DISCUSSION <br /> 3.1 Discussion of Data <br /> Field and analytical data results are summarized in Summary Table 1 and <br />' illustrated in Figures 3 through 5 <br /> The map of groundwater gradient (Figure 3) suggests that the flow direction <br />' and gradient of groundwater is consistent with historical measurements <br />' The water table has fallen almost 3 feet since the last monitoring event in <br /> June A slight local groundwater high to the vicinity OB-5 is evident as has <br /> often been the case in the past <br />' The analytic data suggest that contaminant levels are in the low to middle <br /> range of historical norms <br /> 3.2 Future Work Schedule <br /> The first phase vapor extraction 1 air sparge remedial system has been <br /> completed and operated for 90 days A report of this work and the results was <br /> issued on June 18, 2002 Based on the results of the first phase corrective <br /> action program, an addendum to the Corrective Action Plan was prepared on <br /> August 12, 2002 and submitted to the San Joaquin County Environmental <br /> Health Department The addendum was approved on October 22, 2002 The <br /> budget covering the anticipated costs of the work is being prepared and will <br />' soon be submitted the California UST Clean-up fund for pre-approval <br /> 1 <br /> i <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br />
The URL can be used to link to this page
Your browser does not support the video tag.