Laserfiche WebLink
' Addendum to Corrective Action Plan Page 12 <br /> Former Manna Pro Site <br />' Project No 207 3 <br /> . August 12, 2002 II <br /> 6.0 REPORTING <br /> Reports will be submitted upon completion of various aspects of remedial systems <br /> installation and operation <br />' 6.1 Report of System Installation <br /> A report documenting the installation and start-up operations of the remedial system will <br /> be submitted after the system has been in operation for 30 days <br />' 6.2 Operating Reports <br /> A report documenting the status and progress corrective operations will be submitted on a <br /> quarterly basis or as may be otherwise directed by the LOP agency <br /> I <br />� i <br /> i <br /> I <br /> I <br /> I <br /> • <br /> r2937 Veneman Ave,413240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br />