My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009541
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009541
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:28:28 PM
Creation date
7/30/2019 2:42:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009541
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.a I <br /> I <br /> 1 � <br /> GEO-PHASE <br /> ENVIRONMENTAL <br /> 1 <br /> 1 June 18, 2002 <br /> Mr Dan Smith, CFO <br /> 1 Manna Pro Corporation <br /> 707 Spirit 40 Park Drive, Suite 150 <br /> St Louis, MO 63005 <br /> 1 RE Report—First Phase Remedial System Installation and Operation <br /> Former Manna Pro Site,4004 S El Dorado,Street Stockton, California(Site Code 1088) <br /> 1 Dear Mr Smith <br /> 1 A Corrective Action Plan was prepared and submitted on February 16, 2001 that described the <br /> methods and protocols to be used to construct and operate a proposed remedial system The Corrective <br /> . Action Plan was approved by the LOP agency and the anticipated costs were pre-approved for <br /> reimbursement of the first phase of the work by the Underground Storage Tank Clean-up Fund on June <br /> 19, 2001 <br /> The attached report documents the construction of the first phase remedial system and the first 90 days <br /> of operation It also discusses the results of the system performance and makes recommendations for <br /> future work <br /> Thank you for this opportunity to serve your environmental needs <br /> Sincerely, <br />' (Teo-Phase Enviro ental Inc <br /> Stephen M Lankford, RG, REA <br />' President <br /> cc Harlan Knoll, San Joaquin Co,PHS/EHD <br />' Tony Palma, Cutter Lumber Products <br /> rir <br />■ 2937 Veneman Ave ,##8240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209) 569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.