Laserfiche WebLink
Summary Table 4-Vapor Extraction Calculations <br /> i <br /> Date 1 Time Cum Time Extract Rate Daily Air Cum Air PID Vol Load Weight Load Mass Extracted Cum Extracted <br /> 2114102 8 52 AM 0 113 162,720 0 1035 320 2,909 328 00 <br /> 2119102 10 00 AM 121 108 155,520 784,944 1000 306 2,782 299 151 1 <br /> 2125102 100 PM 268 152 218,880 2,125,584 640 102 927 140 2372 <br /> 314102 12 30 PM 436 152 218,880 3,653,184 718 129 1,173 178 361 2 <br /> 3/11/02 8 45 AM 600 152 218,880 5,151,144 580 095 864 131 4507 <br /> 3118102 11 15 AM 770 144 207,360 6,624,264 350 042 382 55 4896 <br /> 3125102 11 00 AM 938 190 273,600 8,536,614 589 087 791 150 5943 <br /> 411102 9 00 AM 1104 151 217,440 10,040,574 534 074 673 101 6643 <br /> 418102 1109 AM 1274 182 262,080 11,898,612 306 037 336 61 7076 <br /> 4/15/02 2 16 PM 1445 151 217,440 13,448,929 120 021 191 29 7281 <br /> 4123102 1129 AM 1635 208 299,520 15,810,353 156 022 200 41 7608 <br /> 4129102 11 07 AM 1778 195 280,800 17,490,863 92 019 173 34 <br /> 7809 <br /> 516102 2 38 PM 1950 151 217,440 19,044,804 183 025 227 34 8053 <br /> 5113102 10 33 AM 2114 195 280,800 20,962,629 126 021 191 37 8306 <br /> 5120102 7 35 AM 2279 185 266,400 22,794,499 65 018 164 30 8514 <br /> UNITS Hours scfm cf/day cf m TPH mIL m lbs 1 day fbs <br /> NM=Not Measured NA=Not Applicable <br />