Laserfiche WebLink
' Report—Fist Phase Remedial System Pae 4 <br /> � Y g <br /> Former Manna Pro Site <br />' Project No 207 3 <br /> June 18,2002 <br />' • The gasoline-laden vapors removed from the extraction system were be treated with <br /> an activated carbon filtration system to destroy the evolved air/ fuel mixture <br />' • This system was operated for 95 days for the purpose of obtaining additional <br /> engineering data to make any needed final design adjustments prior to construction of <br />' the complete remedial system <br /> I <br /> I <br /> 2937 Veneman Ave,#B240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209) 569-0295 <br /> I <br />