s
<br /> Well I D MW-6
<br /> Screened Interval 30 50' Top of Casing Elevation 14 84'
<br /> Diesel I Gasoline Benzene Toluene Ethyl X lone MTBE Depth to Water Change in
<br /> Benzene Water Elevation Elevation
<br /> Units Date b ppb pb b p b b b feet feet feet
<br /> 1012/91 NA NA NA NA NA NA NA 4223 2703 NA
<br /> 1110192 ND<10 120 000 21,000 31 000 3,600 14 000 NA 4083 2563 1 40
<br /> 4123/92 ND<10 110,000 24,000 37,000 3,100 12,000 NA 3854 2334 229
<br /> 7/31192 ND<10 110,000 21,000 32,000 3,300 13,000 NA 4194 2674 -340
<br /> 10/29/92 NA 76 000 19,000 28 000 3 300 12,000 NA 4363 2843 169
<br /> 213193 NA 50,000 4 300 7 600 1,500 5,000 NA 3932 24 12 431
<br /> 4115193 NA 28 000 2,300 3 000 1,400 2,700 NA NA NA NA
<br /> 4116193 NA NA NA NA NA NA NA 3596 2076 336
<br /> 7119193 NA 29,000 4,000 1,800 1,600 2,000 NA 39 15 -23 95 3 19
<br /> 10/27/93 NA 23,000 5,800 1,400 1,500 1,200 NA 4090 2570 175
<br /> 1110194 NA 38 000 6 100 2 400 1,700 1,900 NA 3955 2435 135
<br /> 4114194 NA 44,000 8,900 3,900 2,000 2,900 NA 38 73 -2353 082
<br /> 7114194 NA 41,000 10,000 4 300 2,000 2,900 NA 4030 25 10 157
<br /> 10/12/94 NA 45 000 10,000 3,400 2,100 2,900 NA 4180 26 60 150
<br /> 1130195 NA 43,000 12 000 5 600 2,200 3,900 NA 3910 2390 270
<br /> 4127195 NA 40 000 11,000 5,500 2,300 4,500 NA 3444 1924 4 66
<br /> 7131/95 NA 20 000 3,300 2 800 1,000 1,900 NA 36 36 21 16 -192
<br /> 10/18/95 NA 16,000 2,200 530 650 370 NA 38 75 23 55 239
<br /> 3126/96 NA NA NA NA NA NA NA 3230 -17 10 645
<br /> 5114/96 NA 27,000 3,900 2 600 1,200 2 100 NA 3300 1780 070
<br /> 8/1196 NA NA NA NA NA NA NA 3460 1940 160
<br /> 11/19/96 NA 15 000 2,300 1 400 1 100 1,200 ND<100 3542 2022 082
<br /> 2113197 NA NA NA NA NA NA NA 3059 1539 483
<br /> 5127/97 NA 76,000 22 000 19,000 2200 7,300 ND<500 30 14 1494 045
<br /> 913197 NA NA NA NA NA NA NA 3342 1822 328
<br /> 11/13/97 NA 27,000 4 700 2000 1 600 2,600 ND<30 33 34 -18 14 008
<br /> 215198 NA NA NA NA NA NA NA 2950 1430 384
<br /> 5111/98 NA 83,000 25,000 22 000 2,700 8 800 NA 2357 8 37 593
<br /> 9/9/98 NA NA NA NA NA NA NA NA NA NA
<br /> 11/23/98 NA 18,000 2200 380 720 890 NA 2748 1228 NA
<br /> duplicate 11/23/98 NA 18 000 2,400 390 730 910 NA NA NA NA
<br /> 2125199 NA NA NA NA NA NA NA 2513 993 235
<br /> 6115199 NA 17,000 1,600 370 670 750 NA 25 93 1073 -080
<br /> 1017199 NA NA NA NA NA NA NA 2953 1469 3 60
<br /> 1121100 ND<50 3 380 492 12 157 33 NA 2938 1454 015
<br /> 4126100 NA 19,000 2,850 472 1,020 899 ND<20 2637 1153 301
<br /> 7120100 NA NA NA NA NA NA NA 2744 1260 107
<br /> 1215100 NA 858 130 3 32 10 NA 2929 1445 185
<br /> 3113101 NA 2,750 216 62 120 156 NA 2804 1320 125
<br /> 618101 NA 824 55 4 16 5 NA 2905 1421 -101
<br /> 9/18101 NA 2,720 75 24 52 57 NA 3232 1748 327
<br /> NA=Not sampled not applicable
<br /> ND=Not Detectable Well Elevations Surveyed 9/99
<br /> Elevations Prior to 9199 are an artificial datum
<br />
|