Laserfiche WebLink
Former Manna Pro Site <br /> Page 6 <br /> Quarterly Groundwater Monitoring Report <br /> Project No. 207.2 <br /> April 23, 2002 <br /> , <br /> 3.0 DISCUSSION <br /> I 3.1 Discussion of Data <br /> Field and analytical data results are summarized in Summary Table 1 and <br /> illustrated in Figures 3 through 5. <br /> The map of groundwater gradient (Figure 3) suggests that the flow direction of <br /> groundwater has returned to a normal bearing and gradient. The water table <br /> has risen about 2 feet since the last monitoring event in December. A slight <br /> local groundwater high persists in the vicinity of MW-6 as described in prior <br />' <br /> reports. Since February 14 between 4 and S cubic feet per minute cfm has <br /> p Y p � ) <br /> been injected into the groundwater, but this does not appear to have <br /> j L materially affected the groundwater surface and there is no unusual <br /> "mounding" of the groundwater. <br /> The analytic data suggest that contaminant levels are generally consistent <br /> with what has been observed in past monitoring events, although in one well <br /> (MW-6), the levels are higher than they have been in several years. We <br /> suspect that this may be a result of air sparging mobilizing gasoline <br /> hydrocarbons, but it is too soon to have confidence in this speculation. The <br /> more distal areas appear to display a gradual degradation of the contaminant <br /> plume, but little natural attenuation is occurring in the core area. <br /> 3.2 Future Work Schedule <br /> f <br /> The first phase vapor extraction 1 air sparge remedial system has been <br /> ' constructed and was placed in operation on February 14. A report of the <br /> construction and first 90 days of operation will be completed within the next <br /> 60 days. The results of this initial period will be used to evaluated the <br /> ' engineering characteristics of�the system prior to commencing an expansion of <br /> the vapor extraction 1 air sparge remedial system. Quarterly monitoring will <br /> u continue. <br /> l <br /> 5 <br /> _ 2937 Venexnan Ave.,#B240 Geo Phase Environmental Inc. Phone (209) 569-0293 � <br /> Modesto, CA 95356 Fax (209)569-0293 <br /> f <br />