Laserfiche WebLink
' Former Manna Pro Site Page 4 <br /> Quarterly Groundwater Monitoring Report <br />' Project No 207 2 <br /> . April 2,2041 II <br />' Gasoline contaminated purge & nnseate water generated during the activities described <br /> above was stored in poly drums located on the site American Valley Environmental will <br /> remove this material prior to the next scheduled depth to water measunng event <br />' 2.2 Groundwater Sample Analyses <br /> P Y <br />' Groundwater samples were analyzed as follows <br />' * Total Petroleum Hydrocarbons as Gasoline (TPH-G) by EPA method 8015(m) <br /> • Benzene, Toluene, Ethylbenzene, and Xylene (BTEX) by EPA method 602 <br />' The detection limits are included in the summary analytical data table(Table 1) <br /> Detectable levels of gasoline range petroleum hydrocarbons and/or BTEX compounds were <br /> Ifound in water samples from one of the four wells that were sampled <br /> 2.3 Field Data <br /> The field data for this groundwater monitoring event are summarized in Appendix B and <br /> Table 1 The level of groundwater has risen about 1 3 feet since the last groundwater <br /> monitoring event completed on July December 5, 2000 The northeasterly bearing of <br /> groundwater flow as shown in Figure 3, is generally consistent with past monitoring <br /> events, and is also consistent with the direction observed in the Cutter Lumber site, <br /> adjacent to the north <br /> Based on the field data obtained in this monitoring event, the overall groundwater gradient <br /> and bearing of flow as determined by a 3-point calculation from wells MW-4, MW-8 and <br /> MW-9 is 0 00048 ft/ft on a bearing of N60°E This compares with a gradient and bearing <br /> of 0 00074 ft/ft on a bearing of N61°E from the December monitoring event <br /> I In order to evaluate the effectiveness of the OxygenRelease Compound ORC which was <br /> P ( )� <br /> placed in soil boring ORC-1 during recent pilot test program conducted in the spring of <br /> 2000, the level of dissolved oxygen in MW-6 is being monitored The oxygen level was <br /> determined with a YSI dissolved oxygen meter The `DO' readings have remained <br /> remarkably constant since then and no increase in oxygen was observed that could be <br /> attributed to the ORC material <br /> i <br /> I2.4 Waste Disposal <br /> Purge water from this monitoring event has been temporarily stored in 55-gallon drums on <br /> the site American Valley Waste Oil, a licensed hazardous waste hauler collected will <br /> remove the purge water for recycling prior to the next monitoring event On March 8, <br /> I2937 Veneman Ave,#11240 Geo-Phase Environmental Inc Phone(209)569-0293 <br /> IModesto,CA 95356 Fax(209)569-0293 <br /> 1 <br />