My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009548
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009548
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:21:47 PM
Creation date
7/30/2019 2:47:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009548
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Manna Pro Site Page 2 <br /> Quarterly Groundwater Monitoring Report <br /> Project No 207 2 <br /> • October 27, 2003 <br /> Later, Groundwater Technology Inc (GTI) installed four additional monitoring <br /> wells, a combination groundwater/vapor extraction well and three observation <br /> wells These wells were used for the completion of groundwater pumping and <br />' vapor extraction pilot tests <br /> Between 1996 and April of 2000, the principal remedial activity consisted of <br /> groundwater monitoring In April of 2000, a deep monitoring well (1\4W-11) <br /> was constructed to characterize the vertical distribution of hydrocarbons in the <br /> subsurface At the same time, a new vapor extraction well and an air sparge <br /> well were constructed as part of a pilot remedial test program Based on the <br /> results of the pilot testing, a feasibility study was also completed which <br /> suggested that a combined program of soil vapor extraction with air sparging <br /> was a feasible corrective method The resultant Corrective Action Plan (CAP) <br /> was implemented in 2001 with the construction of the limited, first-phase of <br /> the system The system entailed operation of one vapor extraction well and <br /> two air sparge wells for a period of 90 days The first phase of the CAP was <br /> completed in May of 2002 and documented in a subsequent report <br />' Commencingin March of 2003 the final second-phase of the system was <br /> � p Y <br /> constructed, and the system construction was completed in August of this <br /> years The remedial system consists of 11 vapor extraction wells and eight air <br /> sparge wells along with the associated surface equipment and pipe runs The <br />' drilling of the new service wells and construction of the vapor extraction / air <br /> sparge system was documented in a September 26, 2003 report entitled Rpt <br /> — Vapor Extraction /Air Spare Remedial System Construction Note that, in <br />' the interests of clarity and minimization of clutter, the site maps attached to <br /> this report do not show the 19 service wells <br />' 1.2 Scope of Work <br /> The following work was completed during this round of groundwater <br />' monitoring <br /> 1 The depth to groundwater was measured in 10 monitoring wells, and 5 <br /> observation wells located on, or near the site <br /> 2 Groundwater monitoring included sample collection and subsequent <br /> laboratory analysis from 4 monitoring wells <br /> 3 Collection of purge water from a prior monitoring event for recycling <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br />
The URL can be used to link to this page
Your browser does not support the video tag.