My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009549
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4004
>
3500 - Local Oversight Program
>
PR0544711
>
ARCHIVED REPORTS XR0009549
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:23:07 PM
Creation date
7/30/2019 2:49:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009549
RECORD_ID
PR0544711
PE
3528
FACILITY_ID
FA0005478
FACILITY_NAME
CUTTER LUMBER
STREET_NUMBER
4004
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525005
CURRENT_STATUS
02
SITE_LOCATION
4004 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report—Vapor Extraction/Air Sparge Remedial System Page S <br /> Former Manna Pro Site <br /> Project No 207 3 <br /> • September 26,2003 <br /> 4.0 PILOT TESTING SYSTEM INSTALLATION & OPERATION <br /> Thesurface equipment for the system was newly installed or modified from previously <br />' existing equipment The surface Equipment was connected to service well bath buried <br /> pipe runs This work occurred from May to early September 2003 <br /> The surface equipment is electrically actuated and the previously installed 240-volt, 3- <br /> phase, 70 amp electric service provides the power <br /> 4.1 Trenching and Piping <br /> Haley Construction of Stockton, CA was contracted to install conveyance piping in <br />' trenches to protect it from continual truck traffic associated with ongoing business <br /> operations of Cutter Lumber Products Upon completion of trenching, the vapor <br /> extraction wells were connected to the central equipment area with 3 inch diameter <br />' schedule 40 PVC piping, and the sparge wells were constructed with 2 inch schedule 40 <br /> PVC piping Each wellhead was equipped with a "T" fitting to allow direct access to the <br /> wells and a traffic-rated well box This fittings allows for entry of each well for <br />' sounding, development, pressure testing, or other operations that may be needed during <br /> the life of the project The trenches were back filled with cement slurry to prevent the <br /> possibility of settling and to protect the PVC pipe runs from heavy truck traffic <br /> 4.2 Manifolds <br /> The vapor extraction wells and the sparge wells were equipped with separate manifold <br /> systems to allow simultaneous operation of up to 4 sparge wells and 4 vapor extractor <br /> wells <br />' The vapor extraction manifold consists of a PVC plenum with 3-inch diameter inlet ports <br /> and each of the ports is equipped with a Cam-lock fitting Three-inch flexible hoses, also <br />' equipped with Cam-lock fittings then connect the four plenum inlets to any four of the <br /> vapor extraction wells A 3-inch riser to the manifold area represents each of the vapor <br /> extraction wells, and each riser is equipped with a brass gate valve to control air flow <br />' Upstream of the gate valves, each riser is also equipped with a sample port where samples <br /> of the gasoline-laden vapor from each well may be collected, and the velocity of air in <br /> each well may be measured with a digital manometer <br /> 1 The sparge manifold consists of a 1/4 inch i d plenum with four exhaust outlets and each <br /> outlet is connected to a sparge well with high-pressure flexible hose Each of the four air <br />' outlets is also equipped with an inline, limiting orifice Rotameter flow gauge capable of <br /> monitoring up to 10 scfm of air into each of up to four sparge wells The Rotameters are <br /> also equipped with adjustable air valves that allow the infection rate in each well to be <br /> precisely adjusted and balanced <br />' 2937 Veneman Ave , #B240 Geo-Phase Environmental tnc Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.