Laserfiche WebLink
Former Manna Pro Site Page 2 <br /> Quarterly Groundwater Monitoring Report <br /> Project No 207 2 <br /> October 27, 2005 <br />' Later, Groundwater Technology Inc (GTI) installed four additional monitoring <br /> wells, a combination groundwater/vapor extraction well and three observation <br /> wells <br />' <br /> Beginning in September of 2003, a 19-well soil vapor extraction 1 air sparge <br /> system commenced operations The system has been in operation since then, <br />' although it was shut down during August and September in order to allow the <br /> subsurface fluids and gasses to equilibrate In the interests of clarity and <br />' minimization of clutter, the site maps attached to this report do not show the <br /> 19 service wells <br /> 1.2 Scope of Work <br /> The following work was completed during this round of groundwater <br />' monitoring <br /> 1 The depth to groundwater was measured in 10 monitoring wells, and one <br />' observation well located on, or near the site <br /> 2 Groundwater monitoring included sample collection and subsequent <br /> laboratory analysis from five of the monitoring wells <br /> I <br />' I <br /> 2937 Veneman Ave ,#B240 Geo-Phase Environmental Inc Phone (209) 569-0293 <br /> Modesto, CA 95356 Fax (209) 569-0293 <br /> I <br />