Laserfiche WebLink
�•I ; •' rM <br /> ; State f1 f ,titer Resources ControBoard <br /> Viff.E <br /> Division of Clean Water Programs <br /> �. 014 T Street•Sacramento,California 95814•(916)227-4411 , <br /> Winston H. Hickox s f M tlingLAddress: P.O.Box 944212•Sacramento,California•94244-2120 <br /> .S�c'reurr�•jor Gray Davis <br /> Environmental FAX(91 6)227-4530•Internet Address:,http://www.swreb.ca.gov/—cwphome/ustcf Governor <br /> Protection r y <br /> E E D 2 9 2000 ; <br /> Bob Eustis <br /> Mary Jo Eustis/Eileen RueNirginia Byford 1 <br /> 5457 Covey Creek Cir <br /> Stockton,CA 95207 <br /> UNDERGROUND STORAGE'TANK CLEANUP FUND'PROGRAM,NOTICE OF PERMIT WAIVER j <br /> AND ELIGIBILITY DETERINATION:'CLAIM NUMBER 013915 , FOR SITE 4032.EL DORADO ST <br /> N, STOCKTON i <br /> Your claim has been accepted for placement on the Priority List in.Priority Class"C". Your eligibility is <br /> limited to the waste oil UST removed in 1998. <br /> We have completed our initial review. The next step in the claim review process is to conduct a compliance <br /> review. <br /> Permit Waiver: Under the amended provisions of Section 25299.57 of the Health and Safety Code(H&SC), <br /> the State Board has granted your,request for a waiver for the permit requirement as a condition fo'r eligibility to <br /> the Fund. It is important to note that when a claimant failed to apply for or obtain the permits required <br /> pursuant to Chapter 6.7, Division 20, of the H&SC,by January 1, 1990,and the State Board grants a'waiver <br /> pursuant to Section 2811(a)(2)(B)of the Underground Storage Tank Cleanup Fund Regulations,the claimant's <br /> level of financial responsibility(deductible)is twice the amount otherwise required. In this case,you will be <br /> responsible for the first$10,000 of eligible corrective action costs before the Fund coverage begins:.._ <br /> Compliance Review: Staff reviews;verifies,and processes claims based on the priority and rank within a <br /> priority class. After the Board adopts the Priority List,your claim will remain on the Priority List until your <br /> Priority Class and rank are reached. At that time,staff will-conduct an extensive Compliance Review at the <br /> local regulatory agency or Regional Water Quality Control-Board. During this Compliance Review,staff may <br /> request additional information needed to verify eligibility. Once the Compliance Review is completed,staff <br /> will determine if the claim is valid or must be rejected. If the claim is valid,a Letter of Commitment will be r <br /> issued obligating funds toward the cleanup. If staff determine that you have not complied wit'.i regulations <br /> governing site cleanup,you have not supplied necessary information or documentation, or your claim <br />�-- --- application contains a mater;al-error;-the-claim will be-rejected-.—In such event-=you%Frill be issued a-N6tice of, <br /> Intended Removal from the Priority List, informed of the basis for the proposed removal of your claim, and <br /> provided an opportunity to correct the condition that is the basis for the proposed removal. Your claim will be <br /> barred from further participation in the Fund, if the claim application contains a material error resulting from <br /> fraud or intentional or negligent misrepresentation. <br /> Record keeping_ During your cleanup project you should keep complete.and well organized records of all <br /> corrective action activity and payment transactions. If you are eventually issued a Letter of Commitment,you <br /> will be required to submit: (1) copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices), (2)copies of canceled checks used to pay for work shown on the-invoices, <br /> (3)copies of technical documents (bids,narrative work description,reports);and(4) evidence that the claimant <br /> paid for the work performed(not paid by another party). These documents are necessary for reimbursement <br /> and failure to submit them could impact the amount of reimbursement made by the Fund. It is not necessary..:.:- R w <br /> to submit these documents at this time;however, they will definitely be required prior.to reimbursement.:. <br /> CaGlornia-90Vjr0nme0tV ProteC&0J7 Agency" <br /> %06 Recycled Psper . <br />