My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
4032
>
3500 - Local Oversight Program
>
PR0544713
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 3:55:02 PM
Creation date
7/30/2019 3:42:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544713
PE
3528
FACILITY_ID
FA0007952
FACILITY_NAME
MARTINI AUTO
STREET_NUMBER
4032
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
11518501
CURRENT_STATUS
02
SITE_LOCATION
4032 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.'f • _ ''' ". _ 1 ' • .- ,!_ + , _ r .. 1 - Y It I <br /> 30 September 1998 <br /> AGE-NC Proposal No. 98-1598 <br /> Page 4 of 4 <br /> activities at the site can be performed during normal working hours; 3) All costs incurred due to <br /> regulatory directives, after this proposal, shall be assumed by the Client; 4) Expense incurred <br /> because of unusual or unanticipated ground conditions(such as fill,hard soil,rock,etc.)shall be paid <br /> for by the Client as extra work. <br /> 5.0. SCHEDULE <br /> The work outlined in this proposal can be initiated upon receipt of authorization to proceed from <br /> Mr. Bob Eustis. AGE will'begin work on the project within five days of receipt of authorization to <br /> proceed and $3,000 deposit. The following is an estimated project schedule: <br /> Planning/Permitting/Pre-Field Activities:, 1 week <br /> Probing/Sampling/Laboratory Analysis: 1 =2 weeks <br /> Report Preparation: 2- 3 weeks <br /> 7.0. LIMITATIONS <br /> Should there be any regulatory objections to the project or unanticipatedregulatoryrequirements, p <br /> only the fees for services performed to that time will be billed based on our Standard Schedule of- <br /> Charges. Should the regulatory agencies require additional mootoring,or other-services beyond the I <br /> scope.presented-herein,or.should driIling/sampling show thai contamination is more extensive than. ' <br /> previous reports present;the scope of work;will'rieed to be expanded at an addihonal cost submitted <br /> - <br /> in-w_ ritten_ fonzr .pr_�or to ani►acival work perforrried j <br /> ' We.look'forward to working with you to obtain closure for your site.,:The opportunity to prepare this <br /> proposal is greatly appreciated. Please contact our office if you have any questions <br /> Sincere,' {, <br /> Advnneed G6 nvirarimetital,Inc: Y <br /> Robert E. arty <br /> Project GeoiogistlDirector o perations. <br /> Advanced CeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.